Saturday, August 17, 2013

GSLV D5 Launch - Live in DD1, ISRO Website - August 19-8-2013 - GSAT 14 - Streaming Website, Schedule

Flash News: GSLV D5 Launch Called off- Fuel Leakage in 2nd Stage - New date soon after technical analysis 


Below is old report....

Indian Space Research Organisation (ISRO) is all set to launch Geosynchronous Satellite Launch Vehicle (GSLV-D5) rocket on August 19, 2013 (Monday) at 4.50 pm IST

The live telecast of the GSLV D5 launch in Doordarshan DD National DD1, DD News and ISRO website begins at 4.15 pm itself


Live streaming in:


Webcast, podcast, online stream of the launch can be seen in official ISRO and DD websites
http://isro.org/
http://webcast.gov.in/live/


GSLV D5 Specification:


- Overall Height - 49.13 meter
- Lift off mass - 414.75 Ton
- Lift off thrust - 6773 kilo Newton
- No of stages -3
- Flight duration - 17 minutes 8 seconds
- Indigenously developed Cryogenic Upper Stage (CUS) will be flight tested for 2nd time in this flight


GSAT 14 Satellite


- GSAT 14 is a communication satellite built ISRO
- Payload of - 6 extended C Band Transponders, - 6 Ku band transponders, - 2 Ka band beacons
- Lift-off mass of satellite: 1983 kg
- will be placed 74 deg East longitude in Geostationary Orbit
- Power: 2600 W
- Mission Life - 12 years
Application: Satellite based communication service for tele-medicine, tele-education etc

For more technical details see the brochure in official website
http://www.isro.org/gslv-d5/pdf/brochure.pdf

The launch will be from the 2nd launch pad of Satish Dhawan Space Center (SDSC), SHAR, Sriharikota 

Tags: today Seedha Prasaran today Time - GSLVD5 GSAT14 - SDSC SHAR Aug 19th - 19/8/13 - Mon - Timing Rocket Andhra Pradesh AP - Satellite Salient Features Profile Details - Timings

2 comments:

Anonymous said...

All the Best ISRO

daturadevotion said...

eager to see the live show...

Post a Comment